VIPA to Hold Community Meeting to Discuss Upcoming Renovations to the Boynes Dock in Cruz Bay
top of page
  • Writer's pictureVirgin Islands Port Authority

VIPA to Hold Community Meeting to Discuss Upcoming Renovations to the Boynes Dock in Cruz Bay

The Virgin Islands Port Authority invites the public to a meeting at 6 p.m. on Thursday, January 19, 2023, to discuss the start of construction and improvements to the Loredon L. Boynes Sr. Dock in Cruz Bay, St. John. The meeting will be held in the Cleone H. Creque Legislative Conference Room at the VI Legislature Annex in Cruz Bay, St. John. The meeting will also be available via Zoom by registering via this link: https://us02web.zoom.us/meeting/register/tZ0ocOmoqjsjHtZHbR0EUXEANGIUaF6N4W_I.


VIPA Executive Director Carlton Dowe and Director of Engineering Preston Beyer will present information about the upcoming improvements to the facility scheduled to begin during the first quarter of 2023. The improvements include resurfacing the pier; installing a canopy adjacent to the existing terminal; adding a male and female restroom and adding an electrical room for an emergency power generator. The Legislature of the Virgin Islands appropriated most of the funding for this project, estimated to cost $1.5 million.


###

83 views0 comments
Post: Blog2 Post

Subscribe to Stay Informed about the USVI's Ports

Thank you for your interest.

Telephone:    STT/STJ (340) 774-1629     STX (340) 778-1012

ST. THOMAS/ST. JOHN: 
8074 Lindbergh Bay, St. Thomas VI  00802  - Physical
P.O. Box 301707, St. Thomas, VI 00803 - Mailing

 

ST. CROIX: 
Henry E. Rohlsen Airport Terminal, Estate Manning Bay, Christiansted, St. Croix, VI 00821 - Physical

P.O. Box 1134, St. Croix, VI  00820 - Mailing

  • Facebook
  • Twitter
  • Instagram
  • LinkedIn
  • YouTube
  • TikTok
  • Google Places

©2024 by the Virgin Islands Port Authority

bottom of page