CEKA Parking Garage Construction Starts March 2021
top of page
  • Writer's pictureVirgin Islands Port Authority

CEKA Parking Garage Construction Starts March 2021

Updated: Jan 28, 2021

The Virgin Islands Port Authority will begin the construction of a new, multi-level Parking Transportation Center at the Cyril E. King Airport on St. Thomas in March 2021. The new parking garage will provide over 600 parking spaces and a designated area for all taxis and rental car agencies. During the construction period, there will be very limited parking space at the Cyril E. King Airport. Residents are encouraged to arrange being dropped off and picked up at the airport terminal when traveling.




The Port Authority will provide more details about this project before it begins. For more information about the expansion of the Cyril E. King Airport, visit the Port Authority’s website at www.viport.com or call the Authority’s Public Information Office at (340) 774-1629.

449 views0 comments
Post: Blog2 Post

Subscribe to Stay Informed about the USVI's Ports

Thank you for your interest.

Telephone:    STT/STJ (340) 774-1629     STX (340) 778-1012

ST. THOMAS/ST. JOHN: 
8074 Lindbergh Bay, St. Thomas VI  00802  - Physical
P.O. Box 301707, St. Thomas, VI 00803 - Mailing

 

ST. CROIX: 
Henry E. Rohlsen Airport Terminal, Estate Manning Bay, Christiansted, St. Croix, VI 00821 - Physical

P.O. Box 1134, St. Croix, VI  00820 - Mailing

  • Facebook
  • Twitter
  • Instagram
  • LinkedIn
  • YouTube
  • TikTok
  • Google Places

©2024 by the Virgin Islands Port Authority

bottom of page